clshades
Well-known member
Well, this blew up in my face a little but shit needs done right! Started out with this. Behind this wall is the pipe works for the master bedroom shower. Used to be a rando plastic shelf storing all kinds of random crap, sick of looking at it.
and evolved to this. I had to plywood the entire wall as I can't just pound screws through this wall into the water lines behind. I used the shelf rack system so it can be adjusted as the kid gets bigger. Shelf above can go up another 3 inches if I want. Extended the top past the shelf a little so things don't randomly fall off the sides.
All the edges have veneer edging, it was my 1st time trying the iron on stuff or any veneer for that matter. The plywood is maple veneer which is bloody expensive at 70 bux a sheet. Needed 3 for this project. Due to the weird size of this wall, buying something prebuilt was never gonna work.
Stained, depending on the light it's actually a bit lighter than the picture. As the room is already poorly lit. so I didn't want dark stain.
Coming soon to an 8 year old near me.
May add some addressable RGB lights down the road.
and evolved to this. I had to plywood the entire wall as I can't just pound screws through this wall into the water lines behind. I used the shelf rack system so it can be adjusted as the kid gets bigger. Shelf above can go up another 3 inches if I want. Extended the top past the shelf a little so things don't randomly fall off the sides.
All the edges have veneer edging, it was my 1st time trying the iron on stuff or any veneer for that matter. The plywood is maple veneer which is bloody expensive at 70 bux a sheet. Needed 3 for this project. Due to the weird size of this wall, buying something prebuilt was never gonna work.
Stained, depending on the light it's actually a bit lighter than the picture. As the room is already poorly lit. so I didn't want dark stain.
Coming soon to an 8 year old near me.
May add some addressable RGB lights down the road.