First coat of primer is on the drywall and only have about a dozen touch-ups where there was some porosity in the mud that I missed until primed. Gave them a quick skim and should be about 5 minutes of sanding tomorrow before it's time to do the second primer coat. Hoping one can is enough. It took all of two full cans for the first as the paint was getting absolutely soaked up by the drywall and mud.
Hopefully onto ceiling next weekend and maybe flooring and moulding within a few weeks which will mean I'll have my gym back by July.
Going to a public gym sucks after getting used to a well equipped home gym.
Hopefully onto ceiling next weekend and maybe flooring and moulding within a few weeks which will mean I'll have my gym back by July.
Going to a public gym sucks after getting used to a well equipped home gym.