Only have 1 more run to swap out. From the aggregation switch to the PoE switch. The other fiber run is to my desktop.Another pair of 10gtek DAC cables for the server rack...
Only have 1 more run to swap out. From the aggregation switch to the PoE switch. The other fiber run is to my desktop.Another pair of 10gtek DAC cables for the server rack...
Only have 1 more run to swap out. From the aggregation switch to the PoE switch. The other fiber run is to my desktop.
2.5GB switch w/ 2X 10GB SFP as well as a 4 pack of SFP transceivers. Strong possibility I'm going to grab a Cloud Gateway Fiber sometime in the near future so this will prep the rest of my setup for connecting my Rogers' ONT to 10GB in order to see if there's any over provisioning on my 2.5GB plan.![]()
I have a friend who has one with custom watercooling loop in it. Its pretty slickKinda wondering... did anyone else ever get the Lian-Li box to re-home their 360s? Was it only me that was dumb enough / lian li fan boy enough to do it? Its been running quiet(er) and stable for quite some time, albeit I rarely use it nowadays. Having the whole console cooled by a standard 120mm fan was a really great idea... kinda sad no one has done anything like it since(unless I missed it?).
IMO, all consoles should standardize on more typical fans. Even if its a squirrel cage / blower fan, it would be nice if they were more easily replaceable, more options from mainstream fan maker based off how much noise vs cooling you want or need.
I'm back to writing paragraphs it seems. I'll see myself out now.
To me maybe? I honestly can't remember where mine came from hahaI had one, sold it here like 15 years ago.
Mine has the 360 installed. I thought I sold it to @zoob but really just guessing.To me maybe? I honestly can't remember where mine came from haha
gotta be top five worst things to have to shop forWish it was me! I bought a Falcon new from Future Shop back in the day, and then been picking up random ones from thrift stores over the last couple years to mod for fun.
We are roof shopping now. Really didn’t like seeing the $18k price tag mentioned earlier![]()

Working on week 11, emailed them saying i want a refund or ill work with my bank to get a charge back.I'll definitely be leaving appropriate google reviews for this company....
Piss poor communication and customer service. It'll be over 10 weeks from the day I ordered it before the new expected date of delivery. I bolded 'expected' cause I doubt it'll show up.
xentr_legal_notice_description